iShaker logo
Login
iShaker support

Installing the UPS (Milkshaker)

Milkshaker · Installation

This guide applies to

iS

Machine type

milkshaker

Kit: board with a plate for installation in the machine, wiring set, 12V battery.

Article image
  1. Mount the plate with the board on the side wall of the machine:
Article image
  1. Connect the 24VDC wires to V+ and V- of the machine
    power supply
    power supply
    :
Article image
  1. Disconnect the standard PC power port and connect it from the UPS board:
Article image
  1. Disconnect the PC's standard F_panel connector and connect it from the UPS board. Plug the standard connector into the wiring's socket:
Article image
  1. Unscrew the rear lower panel of the machine. Disconnect the +/- terminals of the power connector and, in their place, connect + and - 220VDC from the UPS board; connect the standard terminals to the connectors on the wires accordingly (finished version on the right):
Article image